Violation Detail
Standard Cited: 19100269 D02 IV Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1486468.015
Citation: 01004C
Citation Type: Serious
Abatement Date: 11/16/2020 2
Initial Penalty: $13,494.00
Current Penalty: $0.00
Issuance Date: 10/09/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A;R
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 11/05/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/05/2020 | $0.00 | 11/16/2020 | Serious | |
Penalty | Z: Issued | 10/09/2020 | $13,494.00 | 11/16/2020 | Serious |
Text For Citation: 01 Item/Group: 004C Hazard:
29 CFR 1910.269(d)(2)(iv): The procedure shall clearly and specifically outline the scope, purpose, responsibility, authorization, rules, and techniques to be applied to the control of hazardous energy, and the measures to enforce compliance including, but not limited to, 29 CFR 1910.269(d)(2)(iv)(A) through (d)(2)(iv)(D). a. On or about August 3, 2020 specific steps were not utilized to implement and verify the effectiveness of energy control procedures including steps for the placement, removal and transfer of lockout/tagout devices while working on the Unit 5 4KV B Buss breaker.�