Violation Detail
Standard Cited: 19101025 E03 II D Lead.
Inspection Nr: 1457786.015
Citation: 01004C
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/14/2020
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 09/01/2020
Gravity:
Report ID: 0627700
Contest Date:
Final Order: 08/06/2020
Related Event Code (REC):
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/06/2020 | $0.00 | 09/01/2020 | Other | |
Penalty | Z: Issued | 07/14/2020 | $0.00 | 08/05/2020 | Serious |
Text For Citation: 01 Item/Group: 004C Hazard:
29 CFR 1910.1025(e)(3)(ii)(D): The written compliance program did not include the air monitoring data documenting the source of the lead emissions: On or about January 22, 2020, for the 39 Line processing area, the employer did not include in the written Lead compliance program, Lead air monitoring data documenting the source of the Lead emissions for Lead pot maintenance operations including, but not limited to cutting brackets from the Lead pot, pumping Lead from the Lead pot, and moving barrels of pumped Lead. The Lead pot maintenance operations exposed employees to Lead in excess of the Lead PEL.