Violation Detail
Standard Cited: 19100303 G01 II General.
Inspection Nr: 1082459.015
Citation: 01004C
Citation Type: Serious
Abatement Date: 02/09/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/28/2016
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0729300
Contest Date:
Final Order: 02/09/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/09/2016 | $0.00 | 02/09/2016 | Serious | |
Penalty | Z: Issued | 01/28/2016 | $0.00 | 02/09/2016 | Serious |
Text For Citation: 01 Item/Group: 004C Hazard:
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage: a. On July 28, 2015, at the time of the inspection, three electrical panels were used for storage of baskets or boxes; the space in front of the rear main electrical panels was used for storage of merchandise which could result in an electrical shock because of inhibition to access a circuit breaker, especially during an emergency. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).