Violation Detail
Standard Cited: 19261416 D03
Inspection Nr: 978233.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 08/19/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/30/2014
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0522500
Contest Date:
Final Order: 08/20/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/20/2014 | $0.00 | 08/19/2014 | Serious | |
Penalty | Z: Issued | 07/30/2014 | $0.00 | 08/19/2014 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1926.1416(d)(3): Category I operational aids and alternative measures. Operational aids listed in this paragraph that are not working properly must be repaired no later than 7 calendar days after the deficiency occurs. Exception: If the employer documents that it has ordered the necessary parts within 7 calendar days of the occurrence of the deficiency, the repair must be completed within 7 calendar days of receipt of the parts. Anti two-blocking device. a. The anti two-blocking device on the Grove Crane was inoperable and no steps had been taken to correct the deficiency. The employees were exposed to a struck by hazard.