Violation Detail
Standard Cited: 19260451 C02 I General requirements.
Inspection Nr: 920622.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/16/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/22/2013
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 11/07/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/07/2013 | $0.00 | 08/22/2013 | Serious | |
| Penalty | Z: Issued | 08/16/2013 | $0.00 | 08/22/2013 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement: a) Exterior Front of Structure - Employees were engaged in a brick laying operation while standing on a tubular welded frame scaffold 30 feet above the ground and the base plates were resting on mud sills that were partially undermined, on or about 07/18/13. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.