Violation Detail
Standard Cited: 19100219 E01 I Mechanical power-transmission apparatus.
Inspection Nr: 857004.015
Citation: 01004B
Citation Type: Other
Abatement Date: 03/17/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/04/2013
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity:
Report ID: 0317500
Contest Date:
Final Order: 03/20/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/20/2013 | $0.00 | 03/17/2013 | Other | |
Penalty | Z: Issued | 03/04/2013 | $0.00 | 03/17/2013 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.219(e)(1)(i): Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt: a) In the Production Room, on or about January 24, 2013 - The horizontal belts on the Brushing/Grinding Units were not enclosed by guards.