Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 01004B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 25
Nr Exposed: 250
Abatement Date: 04/19/2010
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | D: Govt Dismissed | 09/27/2018 | $0.00 | Serious | ||
Penalty | Z: Issued | 03/08/2010 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard: REFINERY
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment th at were outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refinin g, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discharge Condenser-Top (PR 543018) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. b.BP-Husky Refining, LLC - Oregon, Ohio: On or about Sep tember 10, 2009, the Compressor Discharge Condenser-Btm (PR 543019) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. c.BP-Husky Ref ining, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discha rge Condenser-Top (PR 543020) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. d.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Com pressor Discharge Condenser-Btm (PR 543021) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. e.BP-Husky Refining, LLC - Oregon, Ohi o: On or about September 10, 2009, the Isobutane Tower Overhead Condenser-Top (P R 543023) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. f.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Isobutane Tower Overhead Condenser-Btm (PR 543024) in the Alky 1 unit was d eficient, in that, it did not have a grounding cable. g.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Debutanizer Overhead Condense r-East (PR 543027) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. h.BP-Husky Refining, LLC - Oregon, Ohio : On or about September 10, 2009, the Debutanizer Reboiler (PR 543028) in the Al ky 1 unit was deficient, in that, it did not have a grounding cable. i.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Debutanizer Ov erhead Condenser-West (PR 543048) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. j.BP-Husky Refining, LLC - Oregon, Ohio: On or a bout September 10, 2009, the Total Alkylate Cooler (PR 543238) in the Alky 1 uni t was deficient, in that, it did not have a grounding cable. k.BP-Husky Refining , LLC - Oregon, Ohio: On or about September 10, 2009, the Condensate Effluent Ex changer-Top (PR 543596) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. l.BP-Husky Refining, LLC - Oregon, Ohio : On or about September 10, 2009, the Condensate Effluent Exchanger-Btm (PR 5435 97) in the Alky 1 unit was deficient in, that, it did not have a grounding cable . m.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the A cid Settler/Dry Drum (PR 511383) in the Alky 2 unit was deficient, in that, it d id not have a grounding cable. n.BP-Husky Refining, LLC - Oregon, Ohio: On or ab out September 10, 2009, the Isobutane Coalescer (PR 511392) in the Alky 2 unit w as deficient, in that, it did not have a grounding cable. o.BP-Husky Refining, L LC - Oregon, Ohio: On or about September 10, 2009, the Butane Recycle Coalescer (PR 511394) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. p.BP-Husky Refining, LLC - Oregon, Ohio: On or a bout September 10, 2009, the Effluent Coalescer (PR 511399) in the Alky 2 unit w as deficient, in that, it did not have a grounding cable. q.BP-Husky Refining, L LC - Oregon, Ohio: On or about September 10, 2009, the Caustic Storage Drum (PR 511481) in the Alky 2 unit was deficient, in that, it did not have a grounding c able. r.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, t he Depropanizer Feed Treater (PR 511518) in the Alky 2 unit was deficient, in th at, it did not have a grounding cable. s.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Rerun Tower Bottoms Reboiler (PR 540007) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. t.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Feed Chiller (PR 540061) in the Alky 2 unit was de ficient, in that, it did not have a grounding cable. u.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Recycle Chiller (PR 543558) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. v.BP -Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the DIB Ove rhead Receiver (PR 511443) in the Alky 3 unit was deficient, in that, it did not have a grounding cable. w.BP-Husky Refining, LLC - Oregon, Ohio: On or about Se ptember 10, 2009, the Hydrocarbon Degasser (PR 511743) in the Alky 3 unit was deficient, in that, it d id not have a grounding cable. x.BP-Husky Refining, LLC - Oregon, Ohio: On or ab out September 10, 2009, the employer did not ensure the Safety Instrumented Syst em bypass functions overseen in the central control room were password protected or controlled with a keyed lock. y.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure an intervening valve betw een the relief device and the Sour Gas knock out drum (PR511923) was car sealed open. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be inc luded with your certification. This documentation may include, but is not limite d to, evidence of the purchase or repair of the equipment, photographic or video evidence of ab atement, or other written records.t,