Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1799968.015
Citation: 01004B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/27/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/24/2025
Gravity: 1
Report ID: 0524200
Contest Date: 07/15/2025
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/18/2025 | $0.00 | 07/24/2025 | Serious | |
Penalty | Z: Issued | 06/27/2025 | $0.00 | 07/24/2025 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) On or about January 24, 2025, a flexible cord was used as a substitute for the fixed wiring of a structure near the secondary Control Center of the facility, where power was provided to a computer across a walkway on the mezzanine level of the Symbotic, LLC work area. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.