Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1763848.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $0.00
Issuance Date: 12/11/2024
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 01/08/2025
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 01/10/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/10/2025 | $0.00 | 01/08/2025 | Serious | |
Penalty | Z: Issued | 12/11/2024 | $16,131.00 | 01/08/2025 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. On or about July 13, 2024, Plant #2, employees were performing demolition activities without first determining if the roof had the strength or structural integrity to support the employees.