Violation Detail
Standard Cited: 19100333 C03 III A Selection and use of work practices
Inspection Nr: 1751433.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 12/23/2024 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/26/2024
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 12/17/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/17/2024 | $0.00 | 12/23/2024 | Serious | |
Penalty | Z: Issued | 11/26/2024 | $0.00 | 12/23/2024 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.333(c)(3)(iii)(A): Vehicles or mechanical equipment capable of having parts of their structures elevated near energized overhead lines were not operated so that a clearance of 10 feet (305 cm) was maintained: (a) On or about May 29, 2024, at a lot southwest of the plant farm, employees performing tree-trimming operations used a powered industrial truck to elevate a work platform near energized overhead power lines, exposing employees to an electrical hazard.