Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1719998.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $16,131.00
Current Penalty: $0.00
Issuance Date: 06/05/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/02/2024
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 06/20/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/20/2024 | $0.00 | 07/02/2024 | Serious | |
Penalty | Z: Issued | 06/05/2024 | $16,131.00 | 07/02/2024 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(d)(2): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment: On or about December 31, 2023, at the Mainline No. 2 Core Station, PA-134, employees performed servicing and maintenance activities such as, but not limited to closing off, locking out, and bleeding the hydraulic lines of the hoist chain and components, without first deenergizing the machine.