Violation Detail
Standard Cited: 19100184 E02 II Slings.
Inspection Nr: 1703956.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $16,131.00
Current Penalty: $0.00
Issuance Date: 02/09/2024
Nr Instances: 2
Nr Exposed: 16
Abatement Date:
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 03/18/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/18/2024 | $0.00 | Serious | ||
Penalty | Z: Issued | 02/09/2024 | $16,131.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.184(e)(2)(ii): Makeshift link(s) or fastener(s) formed from bolts, or other such attachment(s) were used to connect links or fastenings on alloy steel chain sling(s): a) On or about October 17, 2023, a makeshift alloy steel chain link comprised of bolts and shackles/clevis was utilized on the 1Ton Gorbel overhead Gantry Crane located in the assembly area. The rated capacity of the sling was compromised and exposed employees to a hazard from suspended loads. b) On or about October 17, 2023, a makeshift clevis comprised of bolts to hold the load was used on the 1/2Ton Gorbel overhead Gantry Crane located in the assembly area. The rated capacity of the shackle/clevis attachment was compromised and exposed employees to a hazard from suspended loads.