Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1672240.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $0.00
Issuance Date: 11/16/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/13/2023
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 12/14/2023
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/14/2023 | $0.00 | 12/13/2023 | Serious | |
Penalty | Z: Issued | 11/16/2023 | $15,625.00 | 12/13/2023 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(d)(6): Prior to starting work on machines or equipment the authorized employee did not verify that isolation and de-energization of the machine or equipment had been accomplished. On or about May 23, 2023, at the Prime G Reboiler Pass 4 Control Valve at the Wynnewood Refinery in Wynnewood Oklahoma, employees did not verify the equipment being maintained had been isolated and de-energized. This exposed the employees to fire and chemical release hazards.