Violation Detail
Standard Cited: 19100269 N03 Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1591733.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/24/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/15/2022
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 09/19/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/19/2022 | $0.00 | 09/15/2022 | Serious | |
Penalty | Z: Issued | 08/24/2022 | $0.00 | 09/15/2022 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.269(n)(3):Equipotential zone. Temporary protective grounds were not placed at such locations and arranged in such a manner that the employer can demonstrate will prevent each employee from being exposed to hazardous differences in electric potential. Note to paragraph (n)(3): Appendix C to this section contains guidelines for establishing the equipotential zone required by this paragraph. The Occupational Safety and Health Administration will deem grounding practices meeting these guidelines as complying with paragraph (n)(3) of this section. On or about March 22, 2022, and at times prior thereto, temporary protective grounds were not installed to prevent employees from being exposed to a hazardous differences in electrical potential.