Violation Detail
Standard Cited: 19260651 B03 Specific Excavation Requirements.
Inspection Nr: 1590120.015
Citation: 01004B
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/19/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0111100
Contest Date: 08/09/2022
Final Order: 10/26/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/26/2022 | $0.00 | Other | ||
Penalty | C: Contested | 10/04/2022 | $0.00 | Serious | ||
Penalty | Z: Issued | 07/19/2022 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1926.651(b)(3): When excavation operations approach the estimated location of underground installations, the exact location of the installations shall be determined by safe and acceptable means: Unity Solar Farm - On or about April 5, 2022, the employer did not find the exact location of energized underground 13,500 volt powerlines before the excavator struck and damaged the conduit containing the lines.