Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1583381.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/31/2022
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/20/2022
Gravity: 1
Report ID: 0524200
Contest Date:
Final Order: 09/28/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/31/2022 | $0.00 | 09/20/2022 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Panning Room- On March 15, 2022, the employer failed to provide permanent wiring for the four outlet gang box that was mounted to the scale table in the north Panning Room. A homemade flexible cord was used to power the gang box and that cord was affixed to the power receptacle with a zip tie making it permanent wiring. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.