Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1550498.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,144.00
Current Penalty: $0.00
Issuance Date: 02/09/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/03/2022
Gravity: 5
Report ID: 0523300
Contest Date: 03/08/2022
Final Order: 07/05/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/05/2022 | $0.00 | 03/03/2022 | Serious | |
Penalty | C: Contested | 03/09/2022 | $4,144.00 | 03/03/2022 | Serious | |
Penalty | Z: Issued | 02/09/2022 | $4,144.00 | 03/03/2022 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(c)(4)(i):Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about August 30, 2021, the employer did not ensure that procedures were developed, documented and utilized for the control of potentially hazardous energy, such as, but not limited, to mechanical energy, for employees who were performing serving operations on equipment such as, but not limited to, chain(s) in the Boiler Room and chain(s) in Room under the Silo.