Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1461116.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/23/2020
Nr Instances: 2
Nr Exposed: 10
Abatement Date: 05/19/2020
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 05/18/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/18/2020 | $0.00 | 05/19/2020 | Serious | |
Penalty | Z: Issued | 04/23/2020 | $0.00 | 05/19/2020 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about February 7, 2020 production area: Where employees perform service and/or maintenance consisting of but limited to installing, setup, repair, and processing the molds, press, and other machines, the procedures failed to clearly identify and specify how long need to wait for the injection molds to cool off when they heat up to 400 degrees.