Violation Detail
Standard Cited: 19260651 J02 Specific Excavation Requirements.
Inspection Nr: 1459102.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/16/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/03/2020
Gravity: 5
Report ID: 0112000
Contest Date: 08/14/2020
Final Order: 08/28/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/28/2020 | $0.00 | 08/03/2020 | Serious | |
Penalty | C: Contested | 08/17/2020 | $0.00 | 08/03/2020 | Serious | |
Penalty | Z: Issued | 06/16/2020 | $0.00 | 08/03/2020 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1926.651(j)(2): Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. On or about 01/29/2020 at the Danbury Road Construction Project, the spoil pile was piled at the edge of the excavation.