Violation Detail
Standard Cited: 19101025 E03 II C Lead.
Inspection Nr: 1457786.015
Citation: 01004B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/14/2020
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 09/01/2020
Gravity:
Report ID: 0627700
Contest Date:
Final Order: 08/06/2020
Related Event Code (REC):
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/06/2020 | $0.00 | 09/01/2020 | Other | |
Penalty | Z: Issued | 07/14/2020 | $0.00 | 08/05/2020 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.1025(e)(3)(ii)(C): The written compliance program did not include a report on the technology considered: On or about January 22, 2020, for the 39 Line processing area, the employer did not include in the written Lead compliance program, a report on the technology considered to comply with the Lead PEL for heat treating wire using a Lead pot. The employees were exposed in excess of the Lead PEL during tasks including, but not limited to drossing the Lead pot.