Violation Detail
Standard Cited: 19261101 G01 III Asbestos
Inspection Nr: 1442758.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/07/2020
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 05/04/2020
Related Event Code (REC):
Emphasis:
Substance: 9020
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 04/07/2020 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1926.1101(g)(1)(iii): The employer did not use work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of prompt clean-up and disposal of wastes and debris contaminated with asbestos, in leak-tight containers: a) 125-133 West 2nd Street, Plainfield, NJ 07060 - Outside lot Employee(s) of Black Dog Construction cleaned up construction debris containing between 70% and 75% chrysotile asbestos, and left the materials in debris piles on the ground. Violation occurred on or about November 5, 2019.
Translate