Violation Detail
Standard Cited: 19100269 A02 VII Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1425017.015
Citation: 01004B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/03/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/01/2019
Gravity:
Report ID: 0636900
Contest Date: 09/26/2019
Final Order: 03/13/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 03/13/2020 | $0.00 | 10/01/2019 | Other | |
| Penalty | C: Contested | 03/03/2020 | $0.00 | 10/01/2019 | Serious | |
| Penalty | Z: Issued | 09/03/2019 | $0.00 | 10/01/2019 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.269(a)(2)(vii): The retraining did not reestablish employee proficiency and new or revised control methods and procedures were not introduced, as necessary. At the facility located at 12567 FM 3430 Vernon, Texas: The employer did not ensure employee proficiency in energy control and protection to arc flash hazards was established or new or revised methods were provided where deficiencies existed when employees worked with or near energized equipment.