Violation Detail
Standard Cited: 19100179 J03 Overhead and gantry cranes.
Inspection Nr: 1382761.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/24/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 08/07/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/07/2019 | $0.00 | Serious | ||
Penalty | Z: Issued | 07/24/2019 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.179(j)(3): Complete inspections of the crane was not being performed at intervals as generally defined in paragraph (j)(1)(ii)(b) of this section: On or about March 5, 2019, the employer did not conduct periodic (annual) inspections of the overhead cranes to include but not limited to the Budgit 1 ton located at the plating department. The cranes are used on a daily basis to put pieces into and out of the plating tanks.