Violation Detail
Standard Cited: 19260062 G01 Lead
Inspection Nr: 1309360.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/11/2018
Nr Instances: 1
Nr Exposed: 20
Abatement Date:
Gravity: 5
Report ID: 0213600
Contest Date: 10/04/2018
Final Order: 02/25/2019
Related Event Code (REC): C
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 02/25/2019 | $0.00 | Serious | ||
Penalty | C: Contested | 10/11/2018 | $0.00 | Serious | ||
Penalty | Z: Issued | 09/11/2018 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1926.62(g)(1): As interim protection for employees performing tasks as specified in paragraph (d)(2) of this section, the employer did not provide at no cost to the employee and assure that the employee uses appropriate protective work clothing and equipment that prevents contamination of the employee and the employee's garments such as, but not limited to, (i) coveralls or similar full-body clothing, and (ii) gloves, hats, and shoes or disposable shoe coverlets: a) Reptile house attic and habitat area - On or about 02/23/2018 - 03/24/2018, employees used power saws and jack-hammers to perform manual demolition of structures including benches, louvers, and rock features with lead content which ranged between 0.0091%-26.182% by weight and between 33.28ug/10cm2 - 2189ug/10cm2 surface concentration. The employer did not provide and assure the use of appropriate protective work clothing and equipment. Employees wore their street clothing while performing these tasks. NO ABATEMENT DOCUMENTATION REQUIRED