Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1304632.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 07/06/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/11/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0316400
Contest Date: 07/18/2018
Final Order: 02/02/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 01/23/2020 | $0.00 | 07/06/2018 | Serious | |
Penalty | F: Formal Settlement | 02/02/2019 | $0.00 | 07/06/2018 | Serious | |
Penalty | Z: Issued | 06/11/2018 | $0.00 | 07/06/2018 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed: (a) 4 Bay: On March 20, 2018 and times prior, the employer did not conduct an annual periodic inspection between an inspector and authorized employee to ensure that the employee(s) followed the energy control procedures for the, but not limited to, the Acer E-Mill (model #3VKH-54) which has multiple energy sources; 240 volt electrical and 95 psi pneumatic pressure.