Violation Detail
Standard Cited: 19100036 B01 Design and construction requirements for exit routes.
Inspection Nr: 1182966.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/10/2017
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0213900
Contest Date: 05/01/2017
Final Order: 05/31/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 05/31/2018 | $0.00 | Serious | ||
Penalty | C: Contested | 05/04/2017 | $0.00 | Serious | ||
Penalty | Z: Issued | 04/10/2017 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.36(b)(1): At least two exits routes were not available to permit prompt evacuation of employees during an emergency. a) Roof: There was only one exit route available for employee use. employees would have to reenter the building, potentially through a hazardous area, in order to evacuate from the roof, on or about , on or about 10/11/2016.