Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1172921.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/03/2017
Nr Instances: 13
Nr Exposed: 4
Abatement Date: 03/09/2017
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 02/17/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/17/2017 | $0.00 | 03/09/2017 | Serious | |
Penalty | Z: Issued | 02/03/2017 | $0.00 | 03/09/2017 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: On or about August 25, 2016, and at time prior thereto, at this manufacturing plastic plant production area where employees were exposed to struck-by, caught-in, mechanical, thermal, stored, pressurize and electrical hazardous energies when performing service and/or maintenance, periodic inspections of the energy control procedures were not conducted for the following types of machines: a. CNC Robot automatic system; b. Plastic molding press; c. Hydraulic injection molding machines MG-2300; d. Hydraulic injection molding machines MG-4400; e. Heat Controller Machine; f. Router 1; g. Dryer Hopper Temperature Controller #1; h. Dryer Hopper Temperature Controller #2; i. Dryer Hopper Temperature Controller #5; j. Carousel Plus Dehumidifying Dryer; k. Gravimetric Batch Blender Mixer; l. Direct Gas-Fired Industrial Air Handler; and, m. Rotary Screw Air Compressor.