Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1123560.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/29/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/17/2016
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 08/19/2016
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/19/2016 | $0.00 | 10/17/2016 | Serious | |
| Penalty | Z: Issued | 07/29/2016 | $0.00 | 08/17/2016 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees. a) Ductile Muller - On February 8, 2016 and times prior, an energy isolating device was not applied to lock out the gate valve to the batch hopper air supply. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.