Violation Detail
Standard Cited: 19100269 D08 II B Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1102415.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 06/13/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/26/2016
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0418200
Contest Date: 05/16/2016
Final Order: 03/31/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/31/2017 | $0.00 | 06/13/2016 | Serious | |
Penalty | C: Contested | 05/20/2016 | $0.00 | 06/13/2016 | Serious | |
Penalty | Z: Issued | 04/26/2016 | $0.00 | 06/13/2016 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.269(d)(8)(ii)(B): Provision shall be made for the authorized employee to ascertain the exposure status of all individual group members with regard to the lockout or tagout of the machine or equipment; a. Plant Bowen, JBR 3/4 Building - The controlling employers tagout (clearance) procedure did not provide a provision to ensure that the contract primary authorized employee was provided an opportunity to review and inspect all energy isolating point, in that the contract authorized employee was not allowed to view and verify low voltage energy source isolation points.