Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1098283.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 11/24/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/28/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0213900
Contest Date:
Final Order: 11/19/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/19/2015 | $0.00 | 11/24/2015 | Serious | |
Penalty | Z: Issued | 10/28/2015 | $0.00 | 11/24/2015 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. a) Dandrea Produce Inc. - Repacking area: The cable from the welding machine had a visible splice covered with masking tape, observed on or about 06/18/2015.