Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1097041.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 04/13/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/21/2016
Nr Instances: 1
Nr Exposed: 20
Related Event Code (REC): R
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 04/21/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/21/2016 | $0.00 | 04/13/2016 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The procedures did not have specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. On or about October 2, 2015, and times prior to, at the MEMC Pasadena, Inc. facility in Pasadena, TX, the employer did not ensure that specific requirements for testing the effectiveness of the isolation of the K92350 Silane compressor before employees began blinding the system for maintenance.