Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1088698.015
Citation: 01004B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $0.00
Issuance Date: 01/14/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/10/2016
Gravity: 10
Report ID: 0213900
Contest Date:
Final Order: 02/10/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/10/2016 | $0.00 | 02/10/2016 | Serious | |
Penalty | Z: Issued | 01/14/2016 | $6,300.00 | 02/10/2016 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) Assem Pak Inc. - Seals area: The Minister Press machine #6 had an unguarded belt and pulley, observed on or about 08/17/2015.