Violation Detail
Standard Cited: 19260451 D12 I General requirements.
Inspection Nr: 998264.015
Citation: 01004A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 03/25/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/13/2015
Gravity: 10
Report ID: 0418800
Contest Date:
Final Order: 04/15/2015
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/15/2015 | $4,200.00 | 04/13/2015 | Serious | |
Penalty | Z: Issued | 03/25/2015 | $7,000.00 | 04/13/2015 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1926.451(d)(12)(i): there were not a minimum of 3 wire clips installed with the clips a minimum of 6 rope diameters apart: On or about October 2, 2014, at the above addressed jobsite, employees were exposed to a fall hazard of approximately 200 feet from the 20th floor of a residential apartment complex under renovation while performing concrete chipping work from a two (2) point suspension scaffold which measured approximately 16 feet in length and 28 inches in width and the wire rope for the tiebacks only had 2 wire clips.