Violation Detail
Standard Cited: 19260451 G01 VI General requirements.
Inspection Nr: 923786.015
Citation: 01004A
Citation Type: Serious
Abatement Date: 09/28/2013 2
Initial Penalty: $2,520.00
Current Penalty: $2,520.00
Issuance Date: 09/10/2013
Nr Instances: 2
Nr Exposed: 8
Related Event Code (REC):
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 10/02/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/10/2013 | $2,520.00 | 09/28/2013 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound top-rail capacity): a) On July 9, 2013 and at times prior thereto; eastside of building; employees working on a scaffold system installing concrete block around the chimney insert were exposed to a 30-40 foot fall at the ends of the working platform. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.