Powered by GoogleTranslate

Violation Detail

Standard Cited: 19261413 B04  

Inspection Nr: 1833452.015

Citation: 01004A

Citation Type: Serious

Abatement Status:  

Initial Penalty: $16,550.00

Current Penalty: $16,550.00

Issuance Date: 12/18/2025

Nr Instances: 1

Nr Exposed: 3

Abatement Date: 01/07/2026

Gravity: 10

Report ID: 0626000

Contest Date: 01/14/2026

Final Order:

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty C: Contested 01/14/2026 $16,550.00 01/07/2026 Serious  
Penalty Z: Issued 12/18/2025 $16,550.00 01/07/2026 Serious  

Text For Citation: 01 Item/Group: 004A Hazard:

29 CFR 1926.1413(b)(4): The wire rope inspections were not documented according to Sec. 1926.1412(e)(3) (monthly inspection documentation): On or about June 24, 2025, and at times prior thereto, at the Massey site, the employer did not ensure certified monthly wire rope inspections were documented for the wire ropes utilized by employees maneuvering, demolishing, and cleaning up the unexpected spaceship anomaly debris.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close