Violation Detail
Standard Cited: 19100119 L01 Process safety management of highly hazardous chemicals.
Inspection Nr: 1809314.015
Citation: 01004A
Citation Type: Serious
Abatement Status:
Initial Penalty: $10,050.00
Current Penalty: $10,050.00
Issuance Date: 08/18/2025
Nr Instances: 1
Nr Exposed: 180
Abatement Date: 10/03/2025
Gravity: 5
Report ID: 0316300
Contest Date: 09/10/2025
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 09/10/2025 | $10,050.00 | 10/03/2025 | Serious | |
| Penalty | Z: Issued | 08/18/2025 | $10,050.00 | 10/03/2025 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.119(l)(1): The employer did not implement procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process: a) Green Lines Multi Base Process, Remote Blocker Building: The employer failed to implement procedures to manage the change from daily cleaning of the basement to weekly cleaning of the basement. Failure to clean the basement of powder and shuck can lead to a fire and/or explosion. Abatement certification is required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Translate