Violation Detail
Standard Cited: 19260850 C Preparatory operations.
Inspection Nr: 1752122.015
Citation: 01004A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 09/27/2024
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 11/01/2024
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 10/28/2024
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/28/2024 | $16,131.00 | 11/01/2024 | Serious | |
Penalty | Z: Issued | 09/27/2024 | $16,131.00 | 11/01/2024 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1926.850(c): All electric, gas, water, steam, sewer, and other service lines were not shut off, capped, or otherwise controlled, outside the building line before demolition work was started, and the affected utility companies were not notified: On or about May 28, 2024, the employer failed to ensure that the natural gas utility company was notified prior to performing demolition operations that involved removing and/or relocating a natural gas service line. Additionally, the gas service line was not shut off, capped or otherwise controlled prior to performing demolition activities at a jobsite in the basement of a business and residential (mixed occupancy) building located at 47 Federal Plaza Central, Realty Tower, Youngstown, OH 44503.