Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1719998.015
Citation: 01004A
Citation Type: Serious
Abatement Date: 07/02/2024 2
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 06/05/2024
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 06/20/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/20/2024 | $16,131.00 | 07/02/2024 | Serious | |
Penalty | Z: Issued | 06/05/2024 | $16,131.00 | 07/02/2024 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about December 31, 2023, at the Mainline No. 2 Core Station, PA-134, employees performed servicing and maintenance activities such as, but not limited to, adjusting the chain on the top of the sprocket of the hoist table, without utilizing the documented energy control procedures.