Violation Detail
Standard Cited: 19260062 D02 V A Lead
This violation item has been deleted.
Inspection Nr: 1719781.015
Citation: 01004A
Citation Type: Serious
Abatement Status:
Initial Penalty: $13,828.00
Current Penalty: $0.00
Issuance Date: 04/24/2024
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 06/11/2024
Gravity: 5
Report ID: 0112000
Contest Date: 05/07/2024
Final Order: 09/20/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/20/2024 | $0.00 | 06/11/2024 | Serious | |
Penalty | C: Contested | 05/10/2024 | $13,828.00 | 06/11/2024 | Serious | |
Penalty | Z: Issued | 04/24/2024 | $13,828.00 | 06/11/2024 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1926.62(d)(2)(v)(A): In the interim, until the employer performs an employee exposure assessment as required under 29 CFR 1926.62(d) and determines actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(iv) with respiratory protection in accordance with 29 CFR 1926.62(f): Decommissioned Millstone Power Station Unit No. 1 Roof: On or about October 24, 2023, and sometime thereafter, without having performed an exposure assessment, the employer failed to provide employees performing high risk "trigger tasks" described in 29 CFR 1926.62(d)(2)(iv) with respiratory protection in accordance with the provisions of 29 CFR 1926.62(f). This occurred while employees torch cut lead-painted surfaces and steel structures such as boiler system piping; roof penetrations, electrical conduits, air handling recirculation units (HVHs), exhaust filter fan units (HVEs), and ductwork, flashing to name a few, that were removed from the following rooftop Unit 1 locations at the Millstone Power Station: a) Maintenance Shop Roof b) Turbine Building Roof c) Reactor Building Roof d) Yard - Radwaste & Radwaste Storage Roof