Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1713967.015
Citation: 01004A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,452.00
Current Penalty: $5,161.60
Issuance Date: 02/15/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/03/2024
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 04/18/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/18/2024 | $5,161.60 | 04/03/2024 | Serious | |
Penalty | Z: Issued | 02/15/2024 | $6,452.00 | 04/03/2024 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: Dock Building: On, or about, December 4, 2023, an exit door and associated stairway provided in the room that housed the propane cylinder filling stations was completely blocked by stacked propane cylinders both on the interior and exterior of the building.