Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1672240.015
Citation: 01004A
Citation Type: Serious
Abatement Date: 12/13/2023 2
Initial Penalty: $15,625.00
Current Penalty: $25,000.00
Issuance Date: 11/16/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 12/14/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/14/2023 | $25,000.00 | 12/13/2023 | Serious | |
Penalty | Z: Issued | 11/16/2023 | $15,625.00 | 12/13/2023 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees. On or about May 23, 2023, at the Prime G Reboiler Pass 4 Control Valve, Wynnewood Refinery in Wynnewood Oklahoma, employees did not affix lockout or tagout devices to each energy isolating device prior to mechanical disassembly of the valve. This exposed the employees to fire and chemical release hazards.