Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1618788.015
Citation: 01004A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,307.00
Current Penalty: $9,230.00
Issuance Date: 12/21/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/19/2023
Gravity: 5
Report ID: 0214500
Contest Date: 01/18/2023
Final Order: 07/12/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 07/12/2023 | $9,230.00 | 01/19/2023 | Serious | |
Penalty | C: Contested | 01/25/2023 | $12,307.00 | 01/19/2023 | Serious | |
Penalty | Z: Issued | 12/21/2022 | $12,307.00 | 01/19/2023 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Reprocessing Department: The employer did not conduct periodic inspection of the company energy control procedures for equipment such as but not limited to Extruder Machine/Line # 6 and # 8, on or about 8/25/2022.