Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 1565302.015
Citation: 01004A
Citation Type: Serious
Abatement Status:
Initial Penalty: $8,287.00
Current Penalty: $0.00
Issuance Date: 02/10/2022
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 02/22/2022
Gravity: 5
Report ID: 0316700
Contest Date: 03/07/2022
Final Order: 04/04/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 07/21/2022 | $8,287.00 | 02/22/2022 | Serious | |
| Penalty | F: Formal Settlement | 04/04/2022 | $0.00 | 02/22/2022 | Serious | |
| Penalty | Z: Issued | 02/10/2022 | $8,287.00 | 02/22/2022 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a. Production line 10 - On or about November 23, 2021, their was flexible cord run from a receptacle affixed to the conveyor system and used to energize a collaborative robot that was anchored and a fixed piece of equipment, exposing employees to an electrical hazard. b. The Covid-19 Screening Guard Post - On or about November 23, 2021, an extension cord had been run from a light pole up through the door of the guard post to provide portable power to the screening post, exposing employees to a fire hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.