Violation Detail
Standard Cited: 19100254 D03 Arc welding and cutting.
Inspection Nr: 1377713.015
Citation: 01004A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,834.00
Current Penalty: $2,917.00
Issuance Date: 06/17/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 07/16/2019
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/16/2019 | $2,917.00 | Serious | ||
Penalty | Z: Issued | 06/17/2019 | $5,834.00 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.254(d)(3): Grounding of the welding machine frame was not checked: a) On or about February 12, 2019, the employer did not ensure that grounding of the arc welders was checked in that employees were receiving shocks.