Violation Detail
Standard Cited: 19260552 A01 Material hoists, personnel hoists, and elevators.
Inspection Nr: 1302419.015
Citation: 01004A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 06/12/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 07/05/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/05/2018 | $12,934.00 | Serious | ||
Penalty | Z: Issued | 06/12/2018 | $12,934.00 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1926.552(a)(1): Where manufacturer's specifications are not available, the limitations assigned to the equipment were not based on the determinations of a professional engineer competent in the field. a. On or about March 16, 2018, at the above addressed jobsite, the material hoist used to lift the PowerStroke portable generator, did not have limitations on the equipment determined by a professional engineer.