Standard Cited: 19100119 F01 Process safety management of highly hazardous chemicals.
Inspection Nr: 1282328.015
Citation: 01004A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,239.00
Current Penalty: $4,975.40
Issuance Date: 06/07/2018
Nr Instances: 4
Nr Exposed: 8
Abatement Date: 07/26/2018
Gravity:
Report ID: 0214200
Contest Date: 06/28/2018
Final Order: 01/18/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/18/2019 | $4,975.40 | 07/26/2018 | Other | |
Penalty | C: Contested | 07/13/2018 | $9,239.00 | 07/26/2018 | Serious | |
Penalty | Z: Issued | 06/07/2018 | $9,239.00 | 07/26/2018 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and addressing at least steps for each operating phase, safe operating limits, safety and health considerations, and safety systems and their functions as outlined by this paragraph: a) Ammonia Delivery SOP The employer failed to develop written operating procedures that provided clear instructions when the written operating procedure for ammonia delivery did not contain specific, clear instructions for actions/steps that needed to be taken inside the plant during delivery. Violation occurred on or about 12/11/17. b) Equipment SOP for recirculators The employer failed to develop written operating procedures that provided clear instructions when the written operating procedures for recirculators LTPR-1, MTPR-1 and HTPR-1 did not contain clear instructions on specific valves to be operated. Violation occurred on or about 12/11/17. c) Equipment SOP for compressors The employer failed to develop written operating procedures that provided clear instructions when the written operating procedures for compressors RB-1, RC-1, RC-2, RC-3, RC-4 and RC-5 did not contain clear instructions on specific valves to be operated. Violation occurred on or about 12/11/17. d) Overall ammonia system operating procedures The employer failed to develop written operating procedures that provided clear instructions for safely conducting operations during normal (planned) shutdown of the entire ammonia refrigeration system or emergency operations to include removal of ammonia released in the containment room. Violation occurred on or about 12/11/17.