Violation Detail
Standard Cited: 19260404 B01 II Wiring design and protection.
Inspection Nr: 1228064.015
Citation: 01004A
Citation Type: Serious
Abatement Date: 10/06/2017 2
Initial Penalty: $3,803.00
Current Penalty: $1,970.50
Issuance Date: 09/28/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 11/10/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/10/2017 | $1,970.50 | 10/06/2017 | Serious | |
Penalty | Z: Issued | 09/28/2017 | $3,803.00 | 10/06/2017 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection: (a) 205 Young Street: On or about April 24, 2017 and times prior, power tools, such as a Dewalt circular saw, Dewalt reciprocating saw, and a Kobalt grinder, were used without a working ground fault circuit interrupter.