Violation Detail
Standard Cited: 19260350 A02 Gas welding and cutting.
Inspection Nr: 1185143.015
Citation: 01004A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,352.00
Current Penalty: $1,176.00
Issuance Date: 11/16/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/22/2016
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 11/30/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/30/2016 | $1,176.00 | 11/22/2016 | Serious | |
Penalty | Z: Issued | 11/16/2016 | $2,352.00 | 11/22/2016 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1926.350(a)(2): When cylinders were hoisted, they were not secured on a cradle, slingboard, or pallet. a) On or about October 20, 2016, a 50 pound liquid petroleum (LP) gas cylinder was hoisted using a choker sling. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).