Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1097041.015
Citation: 01004A
Citation Type: Serious
Abatement Date: 04/13/2016 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 03/21/2016
Nr Instances: 1
Nr Exposed: 20
Related Event Code (REC): R
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 04/21/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/21/2016 | $7,000.00 | 04/13/2016 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The procedure did not clearly and specifically outline the specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about October 2, 2015, and times prior to, at the MEMC Pasadena, Inc. facility in Pasadena, TX, the employer did not ensure that specific steps for isolation, blocking and securing the K92350 Silane compressor was in place before employees began blinding the system for maintenance.