Violation Detail
Standard Cited: 19100303 B01 General.
Inspection Nr: 109462.015
Citation: 01004A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $4,200.00
Current Penalty: $3,780.00
Issuance Date: 03/19/2012
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 05/01/2012
Gravity: 10
Report ID: 0830600
Contest Date:
Final Order: 04/03/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/03/2012 | $3,780.00 | 05/01/2012 | Other | |
| Penalty | Z: Issued | 03/19/2012 | $4,200.00 | 03/22/2012 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) On or about October 26, 2011, and at times prior, Zavanna LLC, as controlling employer, did not ensure that Precision Drilling Company LP, a subcontractor, protected their employees from injury in that, employees were exposed to injury in that the electrical light fixture in the pumphouse was used to support a steam line.
Translate